SR-6 Chehalis River Adna Bridge Replace Expansion Joints 

PROJECT DESCRIPTION

Advanced Government Services was subcontracted to provide traffic control labor for the SR 6 Chehalis River Bridge Project. The scope of this project included grinding off the existing asphalt, replacing the expansion joints and resealing the original, existing textured concrete bridge deck on the SR 6 Chehalis River Adna Bridge. AGS provided TCS and flagging coverage for the project, ensuring a safe work zone.

PROJECT IMAGES

CONTACT US

"*" indicates required fields