SR 9 and 136th St SE VIC to SR 96 VIC Channelization
PROJECT DESCRIPTION
Advanced Government Services was subcontracted by Road Construction Northwest to provide full service traffic control for the SR 9 and 136th St SE project. The scope of the project included planing bituminous pavement, roadway excavation, embankment, surfacing, paving with hot mix asphalt, guardrail, traffic signal system loops, pavement marking, permanent signing, erosion/water pollution control. AGS deployed a large team to provide TMA coverage, pilot car operations and flagging, all at the same time.